0577-67975099

Location:Home  >  Product Center  > Ball Valve > Metal hard seal cast steel fixed ball valve

PRODUCTS Catalog
Ball Valve
CONTACT US
Telephone: 0577-67975099

Metal hard seal cast steel fixed ball valve

  • Profile:

    The difference between the metal hard seal cast steel fixed ball valve and the soft seal fixed ball valve is that the latter is a soft sealing valve seat, while the former's ball and valve seat are hardened by special process, and there are many hardening methods, such as integral nitriding, flame spraying, surfacing welding and so on (not limited to this). The selection of hardening mode depends on the working medium or use High temperature metal hard sealed cast steel fixed ball valve is widely used in petroleum, chemical industry, metallurgy, papermaking, electric power, mining and other industries, especially suitable for medium with high temperature and various dust and solid particles.

Product introduction

The difference between the metal hard seal cast steel fixed ball valve and the soft seal fixed ball valve is that the latter is a soft sealing valve seat, while the former's ball and valve seat are hardened by special process, and there are many hardening methods, such as integral nitriding, flame spraying, surfacing welding and so on (not limited to this). The selection of hardening mode depends on the working medium or use High temperature metal hard sealed cast steel fixed ball valve is widely used in petroleum, chemical industry, metallurgy, papermaking, electric power, mining and other industries, especially suitable for medium with high temperature and various dust and solid particles.

Product parameters

Product Name: metal hard seal cast steel fixed ball valve
Product series: fixed ball valve series, nominal diameter: DN50 ~ DN600, NPS2 "~ 24"
The nominal temperature is - 150.0mpa, the working pressure is - 150.0mpa

Product features

1. The main valve body, auxiliary valve body, gland and other main parts of the product are molded by casting, which has the advantages of light weight and lower cost than forged steel valve.  
2. The flexible movable metal valve seat structure with cylindrical spring or wave spring preload is adopted. The design of sealing preload is reasonable and the closing and opening is flexible, which can effectively ensure the reliability of sealing.  
3. The ball is made of super British speed spraying wear-resistant alloy powder, and the valve seat is overlaid with Stellite cemented carbide and sprayed with other super wear resistant alloy materials.  
4. The sealing surface is finely ground, and the sealing is reliable.  
5. Full diameter channel design, small flow resistance and large flow capacity.  
6. The valve rod anti fly out design is safe and reliable. The anti-static function can be designed according to the requirements.  
7. Automatic pressure relief valve seat design, once the valve body cavity abnormal pressure rise, the valve seat will automatically release to the low pressure end, more safe.  
8. Both the upper and lower valve stems are designed with bearing structure, and the torque is lighter in the process of opening and closing.  
9. A variety of drive mode options: manual, worm gear drive, pneumatic, electric, hydraulic, pneumatic linkage, etc.; can also be used with the automatic transportation control.

Executive Standards

Design and manufacture
Design and Manufacture

Structural length
Face To Face

Flange size
Flange Dimension

Pressure temperature
Pressure Temperature Lating

Test inspection
Inspection And Test

GB122237

GB12221

GB9113 JB79

GB9131

GB/T13927 JB/T9092

Pressure test

Nominal pressure NominalPressure

1.6

2.5

4.0

strength test
Shell Test

2.4

3.8

6.0

Water seal test
Water Seal Test

1.8

2.8

4.4

Airtight seal test
Air Seal Test

0.4-0.7

Material and performance of main parts

valve body
Body

WCB

ZG1Cr18Ni9Ti

CF8

CF3

ZG1Cr18Ni12Mo2Ti

CF8M

CF3M

Ball stem
Ball Stem

2Cr13

1Cr18Ni9Ti

304

304L

1Cr18Ni12Mo2Ti

316

316L

Valve seat
Seat

Polytetrafluoroethylene (PTFE) and Poe fiber reinforced polytetrafluoroethylene PTFE + glass p-phenylene ppl

shim
Shim

PTFE stainless steel / flexible graphite serrated gasketTooth Profile Gasket

Stem seat
Stem Seat

PTFE stainless steel / flexible graphite Stainless Steel/Flexible Graphite

filler
Packing

PTFE reinforced flexible graphite Enhanced Flexible Graphite

Packing gland
Gland

WCB

1Cr18Ni9Ti

304

304L

1Cr18Ni12Mo2Ti

316

316L

temperature
Temperature

-29150(Polytetrafluoroethylene PTFE) - 29 ~ 200 (glass fiber reinforced polytetrafluoroethylene PTFE + glass) - 29 ~ 300 (PPL)

medium
Medium

Steam oil
Water steam
Oil goods

Nitric acid Nitric Acid

Strong oxidation medium
strongey oxidable medium

Acetic acid Acetic Acid

ureas Urea

 

Lattice and main dimensions

1.6MPa

DN

L

D

D1

D2

b

n-φd

H0

H1

H2

Raised face flange
RF

Q347F

16C

16P

16R

32

140

135

100

78

16

4-18

30

85

160

40

165

145

110

85

16

4-18

32

95

230

50

178

160

125

100

16

4-18

43

107

230

65

190

180

145

120

18

4-18

70

142

400

80

203

195

160

135

20

8-18

110

152

400

100

305

215

180

155

20

8-18

150

178

500

125

356

245

210

185

22

8-18

200

252

500

150

394

280

240

210

24

8-23

230

278

600

200

457

335

295

265

26

12-23

260

395

600

250

533

405

355

320

30

12-25

283

480

800

300

610

460

410

375

30

12-25

380

585

800

350

686

520

470

435

34

16-25

425

625

800

400

762

580

525

485

36

16-30

492

720

800

500

914

705

650

608

44

20-34

555

840

830

600

1067

840

770

718

48

20-41

675

1050

830

700

1245

910

940

788

50

24-41

850

1150

830

Service commitment

(1) In strict accordance with the requirements of the contract, to provide qualified products that meet the design standards.
(2) Strictly check and control the quality of raw materials, components and accessories.
(3) Ensure that the processing technology of the equipment is perfect and the detection means are complete. Products will never leave the factory with defects.
(4) Be fully responsible for the supply, quality, equipment performance, technical interface, service and other aspects of the subcontractor. The key parts specified in the contract must meet the requirements of relevant qualification and be approved by the demander.
(5) Provide relevant department standards and drawings to the supervision unit according to the contract, provide convenience for the supervision, and inform the demander and the supervision representative of the shutdown parts of the supervision equipment 7 days in advance. The supervision assigned by the demander is to urge us to produce qualified products according to the standards, but it does not reduce all our quality responsibilities.
(6) The quality defects in the process of equipment manufacturing shall be timely reported to the demander and the supervision representative without concealment. If the equipment defect exceeds the standard specified in the contract, the supplier shall replace it unconditionally. In the process of installation and trial operation, if there are quality problems of the equipment, the problems should be dealt with first, and then the responsibilities should be clarified. Everything should be based on the requirements of project progress.
(7) In case of any accident, we will replace and repair the supplied equipment free of charge as soon as possible until the demander is satisfied.
(8) In case of missing parts or missing parts caused by other reasons in the process of unpacking, we are responsible for making up the missing parts for free as soon as possible. We shall be responsible for the quality problems found during the installation and commissioning of the equipment and in the operation of the equipment in the future.
(9) Provide the demander with all technical data and drawings according to the contract on time. Have the obligation to invite the demander to participate in our technical design audit when necessary.
(10) According to the time required by the demander to the site for technical services, guide the demander to install, trial run and trial production according to the requirements of our technical data and drawings.
(11) For the supporting equipment related to the contract equipment purchased by the demander first, we will actively provide the technology meeting the equipment interface requirements
Conditions and information.
(12) Strictly implement the minutes or agreements of the meeting held by both parties on relevant issues.
(13) According to the provisions of the contract, free business training courses on equipment installation, commissioning, use and maintenance technology shall be held for the demander.
(14) Strengthen pre-sale, in-sales and after-sales services, and implement "24-hour service", "advanced service", "whole process service" and "life-long service" in the whole process of product manufacturing, installation, commissioning and overhaul.
(15) After receiving the quality problem information reflected by the demander, reply within 24 hours or send service personnel to the site as soon as possible, so as to ensure that the user is not satisfied with the quality and the service does not stop.
(16) Free for the product to provide lifelong maintenance, where our factory users, have established a detailed user file, our factory after-sales service. Regular return visit and inspection system are implemented to guide the daily maintenance of users, and timely point out and solve possible faults.
(17) At any time to meet the demander's requirements for spare parts, lifetime to provide users with high-quality and low-cost spare parts.

Related Products More
Related Articles More
Mobile:+86-13777706603 Legal adviser: Beijing Yingke (Wenzhou) law firm Tel:0577-67975099 Address:Shangou Industrial Park, Jiaodong Road, Anfeng Industrial Zone, Yongjia Oubei, Wenzhou, Zhejiang Province

Copyright:Shangou Valve Co.,Ltd    Record No:;    Sitemap    

Friendship Links: SenAu Product website    

Telephone:
0577-67975099

Wechat service number